ROBINSON #3-10-1H
API 3504323540 · Dewey County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACGASInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MISSISSIPPIAN | GAS | 10,355–15,282 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2018-05-10 | 277 | 5,534 | 1,740 | 54.8 | 1,780 | 32/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 9.625 | 40 | P-110 LT&C | 8,603 | 445 |
| INTERMEDIATE | 7" | 26 | P-110 GBCD | 10,016 | 310 |
| PRODUCTION | 4.50" | 13.5 | P-110 BT&C | 15,322 | 485 |
| CONDUCTOR | 20" | — | — | 150 | 10 |
| SURFACE | 13.375" | 48 | J-55 ST&C | 850 | 680 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2017-08-01
WRADRHorizontal holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPIAN | 8,750 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.058850, -98.677940
Every well in Dewey County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.