TCCGU #1H WIW

API 3504323746 · Dewey County, Oklahoma

AC2RIn
API
3504323746
Operator
WHEELER ENERGY LLC
County
Dewey

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2RIn
Injection zone
COTTAGE GROVE
Cumulative fluid injected
121,294 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 202510,6951,101
Nov 20255,175905
Oct 20255,5671,100
Sep 202511,4301,095
Aug 202511,1911,090
Jul 202510,8811,090
Jun 202511,1301,102
May 202510,9751,087
Apr 202510,8301,098
Mar 202511,5011,088
Feb 202510,1081,095
Jan 202511,8111,105

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 0

HORIZONTAL HOLEAC2RIn
Spudded
2022-05-25
Drilling finished
2022-06-14
Completed
2022-06-20
Total depth
10,003 ft
Measured depth
10,003 ft
True vertical depth
7,959 ft
Lateral length
2,258 ft
Operator
WHEELER ENERGY LLC

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION729HCL-808,175350
LINER3.59.300000000000001P-1101,8280
INTERMEDIATE9.62540J-55997300
SURFACE13.37548J-55385400

Drilling permit

Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2022-04-06

WRADRHorizontal hole
Permit API
35043237460000
Operator
WHEELER ENERGY LLC
Well type
2RIn
Approved
2022-04-11
Expires
2023-10-11
Proposed depth
10,574 ft
Surface casing
390 ft
Ground elevation
1,730 ft

Target formation

FormationExpected top (ft)
COTTAGE GROVE7,900

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

35.947026, -98.888818

35.94703, -98.88882 · Surface location as filed with Oklahoma

Every well in Dewey County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.