EDNA 33/4 AP #1H
API 3504323769 · Dewey County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILIntervals
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| CHEROKEE (RED FORK) | OIL | 10,100 | 10,374–15,322 | Frac |
| CHEROKEE | OIL | 9,720 | 15,322–20,262 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2023-04-09 | 850 | 2,546 | 1,866 | 47 | 4,057 | 24/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| LINER | 4 1/2 | 13.5 | P-110 IC | 10,883 | 885 |
| INTERMEDIATE | 7 | 29 | P-110-ICY | 10,364 | 825 |
| INTERMEDIATE | 9 5/8 | 40 | L-80 | 3,964 | 895 |
| SURFACE | 13 3/8 | 54.5 | J-55 | 495 | 395 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2022-11-08
WRADRMUTarget formation
| Formation | Expected top (ft) |
|---|---|
| CHEROKEE | 10,040 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.828469, -99.006077
Every well in Dewey County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.