HOSTUTLER SWD #1
API 3504521839 · Ellis County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 3,420 | 360 |
| Nov 2025 | 4,605 | 360 |
| Oct 2025 | 6,020 | 20 |
| Sep 2025 | 4,653 | 20 |
| Aug 2025 | 13,432 | 20 |
| Jul 2025 | 13,091 | 20 |
| Jun 2025 | 18,977 | 20 |
| May 2025 | 36,193 | 20 |
| Apr 2025 | 16,901 | 20 |
| Mar 2025 | 5,815 | 20 |
| Feb 2025 | 0 | 20 |
| Jan 2025 | 0 | 20 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2DNCInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BROWN DOLOMITE | DISP | 4,610–5,925 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | L-80 | 6,024 | 520 |
| CONDUCTOR | 20 | — | — | 40 | 10 |
| INTERMEDIATE | 9 5/8 | 36/40 | J-55 | 4,575 | 660 |
| SURFACE | 13 3/8 | 48 | H-40 | 606 | 420 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-08-22
WRAREStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| BROWN DOLOMITE | 4,610 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.030596, -99.996141
Every well in Ellis County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.