WORD #4-29H
API 3504523161 · Ellis County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-04-16 | 525 | 571 | 260 | 45.1 | 0 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26# | P110 | 9,820 | 335 |
| LINER | 4 1/2 | 11.60# | HCP110 | 4,728 | 0 |
| CONDUCTOR | 20 | 52.73# | X52 | 85 | 12 |
| SURFACE | 9 5/8 | 36# | J55 | 1,519 | 725 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 6 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-01-23
WRADRHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 7,884 |
| COTTAGE GROVE | 8,434 |
| CLEVELAND | 9,024 |
| MARMATON | 9,534 |
| CHEROKEE | 10,294 |
| ATOKA | 11,087 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.998601, -99.778490
Every well in Ellis County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.