EVERGREEN #1-25
API 3504523379 · Ellis County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 22,804 | 800 |
| Nov 2025 | 26,988 | 1,000 |
| Oct 2025 | 33,219 | 400 |
| Sep 2025 | 31,013 | 700 |
| Aug 2025 | 49,543 | 800 |
| Jul 2025 | 42,829 | 1,100 |
| Jun 2025 | 25,526 | 400 |
| May 2025 | 21,884 | 400 |
| Apr 2025 | 32,781 | 400 |
| Mar 2025 | 34,304 | 400 |
| Feb 2025 | 30,562 | 400 |
| Jan 2025 | 36,638 | 400 |
A dash is a month the well filed with no figure in that column.
Drilling permits
Oklahoma files 3 applications to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-07-25
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| BROWN DOLOMITE | 3,600 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2013-07-25
WRAAMStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| BROWN DOLOMITE | 3,600 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2013-07-25
WRAAMStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| BROWN DOLOMITE | 3,600 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.267340, -99.830480
Every well in Ellis County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.