TERRY LEA #1H-15
API 3504523424 · Ellis County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
HORIZONTAL HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CLEVELAND | OIL | 9,497–13,672 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-04-30 | 45 | 15 | 1,362 | 40 | 1,066 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 7 | 26 | P110 | 9,442 | 525 |
| PRODUCTION | 4 1/2 | 13.5 | P110 | 13,855 | 575 |
| SURFACE | 9 5/8 | 36 | J55 | 1,510 | 790 |
Drilling permits
Oklahoma files 2 applications to drill this well. A permit records what an operator asked to do, not what it did. The well may never have been drilled at all.
Filed 2014-01-09
WRADRHorizontal holeFiled 2014-01-09
WRAAMHorizontal holeLocation
36.043051, -99.642561
Every well in Ellis County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.