WESTON #36-25 1H
API 3504523777 · Ellis County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CHEROKEE | OIL | 10,347–18,361 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2019-02-07 | 470 | 3,075 | 2,930 | 44 | 2,750 | 28 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 9 5/8 | 40 | L-80 | 4,919 | 1,315 |
| INTERMEDIATE | 7 5/8 | 29.7 | HCP-110 | 10,302 | 350 |
| PRODUCTION | 5 1/2 | 20 | P-110 | 18,450 | 640 |
| CONDUCTOR | 20 | 54 | H-40 | 120 | 0 |
| SURFACE | 13 3/8 | 54.4 | LS-55 | 600 | 485 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2018-11-16
WRADRHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 9,880 |
| CHEROKEE | 10,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.983390, -99.601420
Every well in Ellis County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.