TERRYN 8/17 CN #1H
API 3504523871 · Ellis County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILInterval
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| CHEROKEE | OIL | 9,500 | 10,100–19,980 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2022-10-10 | 675 | 1,248 | 1,528 | 47 | 4,070 | 24/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| LINER | 4 1/2 | 13.5 | HCP-110 | 11,050 | 945 |
| INTERMEDIATE | 7 | 29 | HPP-110 | 9,401 | 1,035 |
| SURFACE | 9 5/8 | 36 | J-55 | 1,996 | 705 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2022-07-26
WRADRHorizontal holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| CHEROKEE | 9,600 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.145095, -99.893539
Every well in Ellis County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.