ROBERTSON #6-1
API 3504724379 · Garfield County, Oklahoma
Completions
Oklahoma files 2 completion reports for this well. 2 carry a production test the operator filed.
Completion 1
STRAIGHT HOLEPAOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MISSISSIPPI | OIL | 6,120–6,490 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2009-09-09 | 14 | 33 | 135 | 37.9 | 120 | 19/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 17 | J-55 | 6,688 | 210 |
| SURFACE | 8.625 | 24 | J-55 | 332 | 210 |
Completion 2
STRAIGHT HOLEPAOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MISSISSIPPI | OIL | 6,120–6,490 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-02-08 | 0 | 0 | 130 | — | 20 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 17 | X | 6,688 | 210 |
| SURFACE | 8.625 | 24 | X | 332 | 210 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 9 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2005-09-06
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 5,500 |
| SKINNER | 5,755 |
| RED FORK | 5,850 |
| MANNING | 6,000 |
| MISSISSIPPI | 6,085 |
| MISENER | 6,720 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2009-05-04
WRARCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPI | 6,166 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2012-03-08
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPI | 6,166 |
| MISENER | 6,688 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.497528, -97.877200
Every well in Garfield County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.