L. MCKINLEY #1
API 3504920957 · Garvin County, Oklahoma
AC2DNC
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2DNC
Injection zone
MCLISH|OIL CREEK|TULIP CREEK
Cumulative fluid injected
0 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 3
STRAIGHT HOLEAC2DNCSpudded
1977-02-02
Drilling finished
1977-03-04
Completed
1977-06-13
Recompleted
2020-10-02
First production
1977-06-13
Total depth
4,990 ft
Operator
ST OIL COMPANY LLC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| TULIP CREEK | DRY | 3,890–4,040 |
| MCLISH | DRY | 4,360–4,450 |
| OIL CREEK | DRY | 4,451–4,935 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 23 | K-55 | 4,987 | 1,200 |
| SURFACE | 10 3/4 | 40.5 | K-55 | 318 | 100 |
Completion 4
STRAIGHT HOLEAC2DNCSpudded
1977-02-02
Drilling finished
1977-03-04
Completed
1977-06-13
Recompleted
2021-01-08
First production
1977-06-13
Total depth
4,990 ft
Operator
ST OIL COMPANY LLC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| TULIP CREEK | DISP | 3,890–4,040 |
| MCLISH | DISP | 4,360–4,450 |
| OIL CREEK | DISP | 4,451–4,935 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 23 | K-55 | 4,987 | 1,200 |
| SURFACE | 10 3/4 | 40.5 | K-55 | 318 | 100 |
Location
34.556483, -97.190678
34.55648, -97.19068 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Garvin County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.