GREEN TRUST #1-26
API 3504924777 · Garvin County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEPANTInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| 2ND BROMIDE | GAS | 4,226–4,230 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-09-30 | 1 | 424 | 0 | — | 1,450 | 3/4 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,375 | 150 |
| SURFACE | 9 5/8 | 36 | J-55 | 168 | 110 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2010-02-04
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| HOXBAR | 3,630 |
| DEESE | 4,190 |
| VIOLA | 4,230 |
| BROMIDE 1 | 4,240 |
| BROMIDE 2 | 4,265 |
| BROMIDE 3 | 4,420 |
| MCLISH | 4,600 |
| OIL CREEK | 4,900 |
| JOINS | 5,320 |
| ARBUCKLE | 5,450 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.796555, -97.273555
Every well in Garvin County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.