SHANNON #1-8

API 3504924902 · Garvin County, Oklahoma

PAOIL
API
3504924902
Operator
LARIO OIL AND GAS COMPANY
County
Garvin

Completions

Oklahoma files 2 completion reports for this well. 2 carry a production test the operator filed.

Completion 0

DIRECTIONAL HOLEPAOIL
Spudded
2012-08-02
Drilling finished
2012-08-19
Completed
2012-09-05
First production
2012-09-28
Total depth
6,369 ft
Operator
LARIO OIL AND GAS COMPANY

Interval

FormationProducedPerforated (ft)
OIL CREEKOIL6,080–6,082

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-10-01330318470—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/215.5J-556,349550
CONDUCTOR1645J-554110
SURFACE9 5/836J-55240140

Completion 1

DIRECTIONAL HOLEPAOIL
Spudded
2012-08-02
Drilling finished
2012-08-19
Completed
2012-09-05
Recompleted
2015-07-24
First production
2012-09-28
Total depth
6,373 ft
Operator
LARIO OIL AND GAS COMPANY

Interval

FormationProducedPerforated (ft)Treatment
DEESEDRY4,760–4,772Acid

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2015-07-280019—0—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/215.5J-556,349550
CONDUCTOR1645J-554110
SURFACE9 5/836J-55240140

Drilling permits

Oklahoma files 2 applications to drill this well, naming 11 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2012-06-15

WRADRDirectional hole
Permit API
35049249020000
Operator
LARIO OIL AND GAS COMPANY
Well type
OIL
Approved
2012-06-15
Expires
2012-12-15
Proposed depth
6,345 ft
Proposed measured depth
6,373 ft
Proposed true vertical depth
6,341 ft
Surface casing
240 ft
Ground elevation
971 ft

Target formations

FormationExpected top (ft)
HOXBAR4,586
DEESE4,821
VIOLA4,843
BROMIDE 15,068
BROMIDE 25,188
BROMIDE 35,366
TULIP CREEK5,470
MCLISH5,630
OIL CREEK5,856
ARBUCKLE6,262

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Filed 2015-05-28

WRARCDirectional hole
Permit API
35049249020001
Operator
LARIO OIL AND GAS COMPANY
Well type
OIL
Approved
2015-05-28
Expires
2015-11-28
Proposed depth
6,373 ft
Proposed measured depth
6,373 ft
Proposed true vertical depth
6,341 ft
Surface casing
240 ft
Ground elevation
971 ft

Target formation

FormationExpected top (ft)
DEESE4,760

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

34.743230, -97.330770

34.74323, -97.33077 · Surface location as filed with Oklahoma

Every well in Garvin County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.