N.E.PURDY HART (SIMS 1) #I-9

API 3504938189 · Garvin County, Oklahoma

ACOIL
API
3504938189
Operator
DAYLIGHT PETROLEUM LLC
County
Garvin

Completion

Oklahoma files 1 completion report for this well.

Completion 1

STRAIGHT HOLEACOIL
Spudded
1953-07-25
Drilling finished
1953-09-12
Completed
1953-09-20
Recompleted
2011-11-03
First production
1953-09-20
Total depth
9,225 ft
Operator
DAYLIGHT PETROLEUM LLC

Interval

FormationProducedPerforated (ft)
SPRINGEROIL9,086–9,134

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION723J-559,218450
LINER5 1/217J-559,034375
SURFACE10 3/432.75J-55486300

Location

34.781065, -97.595996

34.78106, -97.59600 · Surface location as filed with Oklahoma

Every well in Garvin County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.