DAVIDSON #3
API 3505123068 · Grady County, Oklahoma
Completions
Oklahoma files 2 completion reports for this well. 2 carry a production test the operator filed.
Completion 0
STRAIGHT HOLEACGASInterval
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| PRIMROSE | GAS | 13,362 | 13,374–14,068 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2022-07-20 | 15 | 545 | 0 | 61 | 5,320 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 7 5/8 | 39 | P110 | 14,190 | 1,890 |
| PRODUCTION | 4 1/2 | 15.1 | P110 | 14,530 | 370 |
| CONDUCTOR | 20 | — | — | 46 | 5 |
| SURFACE | 11 3/4 | 42 | H40 | 1,520 | 840 |
Completion 1
STRAIGHT HOLEACGASIntervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| PRIMROSE | GAS | 13,374–14,068 |
| CUNNINGHAM UP | GAS | 14,398–14,461 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-08-20 | 20 | 1,266 | 8 | — | 0 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 7 5/8 | 39 | P-110 | 14,190 | 1,890 |
| PRODUCTION | 4 1/2 | 15.1 | P-110 | 14,530 | 370 |
| CONDUCTOR | 20 | — | — | 46 | 5 |
| SURFACE | 11 3/4 | 42 | H-40 | 1,520 | 840 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 4 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2002-06-26
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| PRIMROSE | 13,850 |
| CUNNINGHAM UP | 14,450 |
| BOATWRIGHT UP | 16,000 |
| BOATWRIGHT LOW | 16,500 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.934668, -98.088440
Every well in Grady County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.