NORGE MARCHAND UNIT #49-4
API 3505123260 · Grady County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 7,253 | 2,128 |
| Nov 2025 | 7,366 | 2,141 |
| Oct 2025 | 7,333 | 2,153 |
| Sep 2025 | 7,252 | 2,158 |
| Aug 2025 | 7,457 | 2,170 |
| Jul 2025 | 8,260 | 2,201 |
| Jun 2025 | 7,642 | 2,129 |
| May 2025 | 5,587 | 2,189 |
| Apr 2025 | 7,797 | 2,257 |
| Mar 2025 | 8,758 | 2,234 |
| Feb 2025 | 8,060 | 2,235 |
| Jan 2025 | 1,215 | 2,229 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MARCHAND | INJ | 10,560–10,668 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2" | 17 | N-80 | 10,820 | 553 |
| CONDUCTOR | 16" | — | — | 46 | 0 |
| SURFACE | 9 5/8" | 40 | J-55 | 955 | 460 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2005-04-19
WRADRTarget formation
| Formation | Expected top (ft) |
|---|---|
| MARCHAND | 10,520 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.050190, -98.042130
Every well in Grady County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.