CKSMOU #34-28-4 INJ
API 3505125092 · Grady County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 56 | 433 |
| Nov 2025 | 5,742 | 756 |
| Oct 2025 | 10,186 | 992 |
| Sep 2025 | 4,930 | 715 |
| Aug 2025 | 43 | 457 |
| Jul 2025 | 5,492 | 873 |
| Jun 2025 | 3,136 | 677 |
| May 2025 | 0 | 552 |
| Apr 2025 | 4,699 | 865 |
| Mar 2025 | 5,413 | 700 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
DIRECTIONAL HOLEAC2RInInterval
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| MORROW SUBTHRUST | INJ | 9,740 | 9,937–10,237 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5-1/2" | 20# | P-110 | 10,440 | 664 |
| SURFACE | 9-5/8" | 40# | J-55 | 1,525 | 560 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2023-12-07
WRADRDirectional holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| MORROW SUBTHRST | 9,640 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2023-12-08
WRAAMDirectional holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| MORROW SUBTHRST | 9,640 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.694639, -97.706008
Every well in Grady County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.