LUCY #1-5
API 3505321065 · Grant County, Oklahoma
ACOIL
Completions
Oklahoma files 2 completion reports for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1982-12-11
Drilling finished
1982-12-28
Completed
1983-01-11
First production
1983-01-11
Total depth
5,750 ft
Operator
FLATLANDER ENERGY LLC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| MISSISSIPPI | DISP | 4,994–5,464 |
| WILCOX | DISP | 5,670–5,676 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | K-55 | 5,748 | 350 |
| SURFACE | 8 5/8 | 24 | J-55 | 397 | 350 |
Completion 3
STRAIGHT HOLEACOILSpudded
1982-12-11
Drilling finished
1982-12-28
Completed
1983-01-11
First production
1983-01-11
Total depth
5,750 ft
Operator
FLATLANDER ENERGY LLC
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MISSISSIPPI | OIL | 4,994–5,464 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1983-01-15 | 120 | 530 | 150 | 40 | 0 | 16/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | K-55 | 5,748 | 350 |
| SURFACE | 8 5/8 | 24 | J-55 | 397 | 350 |
Location
36.755423, -97.751424
36.75542, -97.75142 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Grant County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.