BLUBAUGH #1-5
API 3505322781 · Grant County, Oklahoma
PADRY
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEPADRYSpudded
2010-12-10
Drilling finished
2010-12-17
Completed
2011-09-30
Total depth
4,921 ft
Operator
MONTY L HOTT PRODUCTION CORPORATION
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| CHEROKEE | DRY | 4,784–4,794 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | J-55 | 4,920 | 225 |
| CONDUCTOR | 20 | 94 | H-40 | 40 | 3 |
| SURFACE | 8 5/8 | 24 | J-55 | 232 | 190 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2010-12-01
WRADRStraight holePermit API
35053227810000
Operator
MONTY L HOTT PRODUCTION CORPORATION
Well type
DRY
Approved
2010-12-01
Expires
2011-06-01
Proposed depth
4,950 ft
Surface casing
200 ft
Ground elevation
1,095 ft
Target formation
| Formation | Expected top (ft) |
|---|---|
| CHEROKEE | 4,800 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Every well in Grant County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.