POSTLEWAIT #1-7 SWD
API 3505323245 · Grant County, Oklahoma
STFDTM
Completions
Oklahoma files 3 completion reports for this well.
Completion 0
STFDTMSpudded
2013-03-15
Drilling finished
2013-04-05
Completed
2013-04-05
Total depth
7,095 ft
Operator
L & L SMITH ENERGY CORPORATION
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| — | — | — | — | — | 0 |
Completion 1
STFDTMSpudded
2013-03-15
Drilling finished
2013-04-05
Completed
2013-08-16
Total depth
7,095 ft
Operator
L & L SMITH ENERGY CORPORATION
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| — | — | — | — | — | 0 |
Completion 2
STRAIGHT HOLESTFDTMSpudded
2013-03-15
Drilling finished
2013-04-05
Completed
2013-08-16
Total depth
7,095 ft
Operator
L & L SMITH ENERGY CORPORATION
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 9 5/8" | 43.5# | L-80 | 5,945 | 525 |
| SURFACE | 13 3/8" | 54.5# | J-55 | 470 | 410 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-02-20
WRADRStraight holePermit API
35053232450000
Operator
DEVON ENERGY PRODUCTION COMPANY LP
Well type
TM
Approved
2013-02-20
Expires
2013-08-20
Proposed depth
8,000 ft
Surface casing
500 ft
Ground elevation
1,086 ft
Target formation
| Formation | Expected top (ft) |
|---|---|
| ARBUCKLE | 5,910 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.826393, -97.769652
36.82639, -97.76965 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Grant County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.