MCELHINEY #4-19
API 3505922481 · Harper County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACGASIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CHEROKEE | OIL | 6,427–6,477 | Acid |
| COMMINGLED | GAS | 6,427–6,530 | Acid |
| ATOKA | GAS | 6,528–6,530 | Acid |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2008-04-30 | 111 | 230 | 3 | 41 | 0 | 64 |
| 2026-02-05 | 0 | 6 | 0 | — | 200 | 64 |
| 2026-02-15 | 0 | 16 | 0 | — | 2,900 | 64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | N-80 | 7,000 | 345 |
| SURFACE | 8 5/8 | 24 / 32 | K-55 | 960 | 700 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-03-20
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| CHEROKEE | 6,405 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2025-12-04
RCLocation
36.802982, -99.825037
Every well in Harper County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.