TUNDER #1-31
API 3505922627 · Harper County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACGASIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| KANSAS CITY | OIL | 5,302–5,314 | Acid |
| OSWEGO | GAS | 5,495–5,516 | Acid |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-12-22 | 28 | 15 | 14 | 43.4 | 840 | 32/64 |
| 2015-12-15 | 0 | 350 | 108 | — | 1,100 | 32/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4-1/2" | 11.6# | J55 | 6,282 | 300 |
| SURFACE | 8-5/8 | 24# | J55 | 746 | 425 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 6 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2014-10-06
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 4,500 |
| LANSING | 4,700 |
| KANSAS CITY | 5,100 |
| OSWEGO | 5,400 |
| ATOKA | 5,600 |
| MORROW | 5,650 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.857719, -99.497509
Every well in Harper County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.