TURNER #5-1
API 3506322353 · Hughes County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
STRAIGHT HOLEACOILSpudded
1985-11-05
Drilling finished
1985-11-22
Completed
1985-12-06
Recompleted
1987-11-01
First production
1985-12-06
Total depth
5,265 ft
Operator
T K DRILLING CORP
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| MISENER | OIL | 4,452–4,460 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2017-03-12 | 13 | 0 | 5 | 42 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 10.5 | J-55 | 4,595 | 100 |
| SURFACE | 8 5/8 | 24 | — | 600 | 400 |
Location
35.106246, -96.279644
35.10625, -96.27964 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Hughes County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.