WALLEYE ISLAND #1-8
API 3506323428 · Hughes County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| UNION VALLEY | OIL | 3,096–3,212 | Acid |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1999-01-12 | 4 | 50 | 20 | — | 700 | — |
| 2012-03-01 | 6 | 0 | 135 | — | 165 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4.5 | 10.5 | J | 3,550 | 180 |
| SURFACE | 8 5/8 | 24 | J | 265 | 175 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 7 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1998-11-25
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| BOOCH | 1,850 |
| HARTSHORNE | 2,100 |
| GILCREASE | 2,350 |
| WAPANUCKA | 2,925 |
| UNION VALLEY | 3,025 |
| CROMWELL | 3,075 |
| JEFFERSON | 3,400 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.274320, -96.064290
Every well in Hughes County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.