COPPEDGE #2-2
API 3506323740 · Hughes County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACGASInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| JEFFERSON | OIL | 3,194–3,230 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-07-09 | 5 | 0 | 50 | 32 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | NLS | 3,254 | 190 |
| SURFACE | 8 5/8 | 24 | LS | 692 | 250 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 8 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2005-10-28
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| CHEROKEE GP | 350 |
| BOOCH | 2,260 |
| HARTSHORNE | 2,400 |
| GILCREASE | 2,550 |
| WAPANUCKA | 2,820 |
| UNION VALLEY LM | 3,050 |
| CROMWELL | 3,080 |
| JEFFERSON | 3,150 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.280055, -96.219349
Every well in Hughes County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.