WANDA LOU #3
API 3506520241 · Jackson County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CISCO | OIL | 1,527–1,533 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2008-05-09 | 8 | 10 | 10 | 41 | 120 | 2 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4.5 | 10.5 | J55 | 1,915 | 14 |
| CONDUCTOR | 10 | — | — | 20 | 0 |
| SURFACE | 7 | 23 | — | 1,340 | 0 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 4 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-07-28
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| WHITEHORSE | 950 |
| EL RENO | 980 |
| ENID | 1,010 |
| CISCO | 1,550 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.576820, -99.282350
Every well in Jackson County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.