GARRY DAVIS #32-27
API 3507124161 · Kay County, Oklahoma
Completions
Oklahoma files 2 completion reports for this well. 2 carry a production test the operator filed.
Completion 2
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| VIOLA | OIL | 4,165–4,170 | Acid, Frac |
| WILCOX | OIL | 4,180–4,220 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2009-04-04 | 2 | 33 | 88 | — | 0 | — |
| 2019-07-31 | 6 | 8 | 1,228 | 41.8 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,452 | 160 |
| SURFACE | 8 5/8 | 23 | J-55 | 333 | 280 |
Completion 2
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| SKINNER | OIL | 3,845 | 3,845–3,851 | Acid, Frac |
| RED FORK | OIL | 3,918 | 3,918–3,938 | Acid, Frac |
| MISSISSIPPI CHAT | OIL | 4,050 | 4,050–4,072 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2022-05-02 | 9 | 41 | 224 | 41 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,452 | 160 |
| SURFACE | 8 5/8 | 23 | J-55 | 333 | 280 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 25 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2007-08-07
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ELGIN | 2,000 |
| OREAD | 2,150 |
| ENDICOTT | 2,200 |
| LAYTON | 3,100 |
| BIG LIME | 3,585 |
| OSWEGO | 3,600 |
| RED FORK | 3,900 |
| MISSISSIPPI CHAT | 4,000 |
| WILCOX | 4,150 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2007-08-07
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ELGIN | 2,000 |
| OREAD | 2,150 |
| ENDICOTT | 2,200 |
| TONKAWA | 2,500 |
| LAYTON | 3,100 |
| OSWEGO | 3,600 |
| RED FORK | 3,900 |
| MISSISSIPPI CHAT | 4,000 |
| VIOLA | 4,100 |
| WILCOX | 4,150 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2021-06-03
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| LAYTON | 3,100 |
| SKINNER | 3,840 |
| RED FORK | 3,900 |
| MISSISSIPPI CHAT | 4,000 |
| VIOLA | 4,165 |
| WILCOX | 4,180 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.613722, -97.298699
Every well in Kay County, Oklahoma