LADY JANE #1-33
API 3507124916 · Kay County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SKINNER | OIL | 2,892–2,904 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2020-03-05 | 43 | 0 | 13 | 44 | 750 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 3,080 | 225 |
| SURFACE | 8 5/8 | 24 | J-55 | 252 | 150 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2020-01-28
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| NEWKIRK | 1,500 |
| COTTAGE GROVE | 2,100 |
| TRUE LAYTON | 2,250 |
| CLEVELAND | 2,700 |
| BIG LIME | 2,800 |
| OSWEGO | 2,850 |
| SKINNER | 2,950 |
| RED FORK | 2,975 |
| BARTLESVILLE | 3,000 |
| MISSISSIPPIAN | 3,050 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.861013, -96.777184
Every well in Kay County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.