MITCHELL #1
API 3507321503 · Kingfisher County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1974-07-29
Drilling finished
1974-08-19
Completed
1974-09-14
Recompleted
1975-01-17
First production
1974-09-14
Total depth
7,770 ft
Operator
BIG CREEK ENERGY LLC
Intervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| OSWEGO | OIL | 6,686–6,698 | Acid, Frac |
| MISSISSIPPI | OIL | 7,278–7,730 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1974-09-19 | 57 | 185 | 0 | 42.6 | 0 | 3/4 |
| 1975-03-26 | 15 | 75 | 11 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 / 17 | K-55 | 7,775 | 400 |
| SURFACE | 8 5/8 | 20 | S-120A | 520 | 400 |
Location
35.906512, -97.892698
35.90651, -97.89270 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Kingfisher County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.