REGGIE #1-27
API 3507324664 · Kingfisher County, Oklahoma
Drilling permits
Oklahoma files 4 applications to drill this well, naming 25 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-11-10
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 6,295 |
| OSWEGO | 6,360 |
| PRUE | 6,510 |
| SKINNER | 6,535 |
| RED FORK | 6,650 |
| MISSISSIPPI LM | 6,962 |
| HUNTON | 7,530 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2008-11-10
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 6,295 |
| OSWEGO | 6,360 |
| PRUE | 6,510 |
| SKINNER | 6,535 |
| RED FORK | 6,650 |
| MISSISSIPPI LM | 6,962 |
| HUNTON | 7,530 |
| VIOLA | 7,795 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2008-11-10
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 6,295 |
| OSWEGO | 6,360 |
| PRUE | 6,510 |
| SKINNER | 6,535 |
| RED FORK | 6,650 |
| MISSISSIPPI LM | 6,962 |
| HUNTON | 7,530 |
| VIOLA | 7,795 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2009-12-31
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 6,295 |
| OSWEGO | 6,360 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.008883, -97.829495
Every well in Kingfisher County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.