CLEAR CREEK #1H-4X

API 3507325280 · Kingfisher County, Oklahoma

ACOIL
API
3507325280
Operator
FW MIDCON I, LLC
County
Kingfisher

Completion

Oklahoma files 1 completion report for this well. One carries a production test the operator filed.

Completion 1

HORIZONTAL HOLEACOIL
Spudded
2016-05-23
Drilling finished
2016-07-13
Completed
2016-08-17
First production
2016-08-18
Total depth
17,833 ft
Operator
FW MIDCON I, LLC

Interval

FormationProducedPerforated (ft)
MISSISSIPPIAN (EX CHESTER)OIL7,500–17,688

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2016-09-142361101,31039.61,00064

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/220P-110-ICY17,8302,410
SURFACE9 5/840J-551,512420

Drilling permits

Oklahoma files 2 applications to drill this well. A permit records what an operator asked to do, not what it did. The well may never have been drilled at all.

Filed 2016-04-21

WRADRHorizontal hole
Permit API
35073252800000
Operator
OVINTIV MID-CONTINENT INC.
Well type
OIL
Approved
2016-04-21
Expires
2016-10-21
Proposed depth
17,784 ft
Surface casing
1,500 ft
Ground elevation
1,164 ft

Filed 2016-04-21

WRAAMHorizontal hole
Permit API
35073252800001
Operator
OVINTIV MID-CONTINENT INC.
Well type
OIL
Approved
2016-04-21
Expires
2016-10-21
Proposed depth
17,784 ft
Surface casing
1,500 ft
Ground elevation
1,164 ft

Location

35.812339, -97.850675

35.81234, -97.85067 · Surface location as filed with Oklahoma

Every well in Kingfisher County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.