LSEPMU (CARTMILL 1) #7-1
API 3507350158 · Kingfisher County, Oklahoma
AC2RIn
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2RIn
Injection zone
PRUE
Cumulative fluid injected
245 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 105 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 10 | 0 |
| Jun 2025 | 130 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 1
STRAIGHT HOLEAC2RInSpudded
1964-07-09
Drilling finished
1964-07-27
Completed
1964-08-06
Recompleted
2013-05-07
First production
1964-08-03
Total depth
6,592 ft
Operator
BCE-MACH III LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| PRUE | INJ | 6,210–6,224 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 14 | — | 6,581 | 150 |
| LINER | 3 1/2 | — | — | 6,295 | 200 |
| SURFACE | 8 5/8 | 28 | — | 274 | 260 |
Completion 2
STRAIGHT HOLEAC2RInSpudded
1964-07-09
Drilling finished
1964-07-27
Completed
1964-08-06
Recompleted
2013-05-07
First production
1964-08-03
Total depth
6,592 ft
Operator
BCE-MACH III LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| PRUE | INJ | 6,210–6,224 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 14 | — | 6,581 | 150 |
| LINER | 3 1/2 | — | — | 6,295 | 200 |
| SURFACE | 8 5/8 | 28 | — | 274 | 260 |
Location
35.929156, -97.695819
35.92916, -97.69582 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Kingfisher County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.