BERKLEY HILLS #1-15
API 3507720721 · Latimer County, Oklahoma
Completion
Oklahoma files 1 completion report for this well.
Completion 3
DIRECTIONAL HOLEACGASInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| SPIRO 1ST | GAS | 15,428–15,562 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 32 | P-110 | 17,250 | 400 |
| CONDUCTOR | 24 | — | — | 25 | 5 |
| INTERMEDIATE | 9-5/8 | 43.5 | P-110 | 6,258 | 3,850 |
| SURFACE | 18-5/8 | 87.5 | K-55 | 620 | 1,150 |
Drilling permits
Oklahoma files 4 applications to drill this well, naming 21 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1992-06-15
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA MID | 6,500 |
| ATOKA LOW | 10,900 |
| SPIRO 1 | 14,400 |
| WAPANUCKA 1 | 14,600 |
| ATOKA LOW 1 | 14,800 |
| SPIRO RPTD1 | 15,000 |
| WAPANUCKA RPTD1 | 15,200 |
| SPIRO RPTD2 | 15,800 |
| WAPANUCKA RPTD2 | 16,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 1992-07-10
WRAAMTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA MID | 6,500 |
| ATOKA LOW | 10,900 |
| SPIRO 1 | 14,400 |
| WAPANUCKA LOW /BASAL/ | 14,600 |
| ATOKA LOW 1 | 14,800 |
| SPIRO RPTD1 | 15,000 |
| WAPANUCKA RPTD1 | 15,200 |
| SPIRO RPTD2 | 15,800 |
| WAPANUCKA RPTD2 | 16,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2005-07-07
WRARCTarget formation
| Formation | Expected top (ft) |
|---|---|
| SPIRO 1 | 15,420 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2015-03-05
WRARCDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SPIRO 1 | 15,420 |
| SPIRO RPTD1 | 16,914 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.815638, -95.185716
Every well in Latimer County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.