ENIS #2
API 3507721702 · Latimer County, Oklahoma
Drilling permits
Oklahoma files 5 applications to drill this well, naming 30 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2007-12-07
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| RED OAK LOW | 6,650 |
| PANOLA | 7,840 |
| BRAZIL | 8,490 |
| ATOKA LOW | 10,090 |
| SPIRO | 12,307 |
| WAPANUCKA | 12,450 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2007-12-07
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| RED OAK LOW | 6,650 |
| PANOLA | 7,840 |
| BRAZIL | 8,490 |
| ATOKA LOW | 10,090 |
| SPIRO | 12,307 |
| WAPANUCKA | 12,450 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2007-12-07
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| RED OAK LOW | 6,650 |
| PANOLA | 7,840 |
| BRAZIL | 8,490 |
| ATOKA LOW | 10,090 |
| SPIRO | 12,307 |
| WAPANUCKA | 12,450 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2007-12-07
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| RED OAK LOW | 6,650 |
| PANOLA | 7,840 |
| BRAZIL | 8,490 |
| ATOKA LOW | 10,090 |
| SPIRO | 12,307 |
| WAPANUCKA | 12,450 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2009-03-05
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| RED OAK LOW | 6,650 |
| PANOLA | 7,840 |
| BRAZIL | 8,490 |
| ATOKA LOW (CECIL 1, CECIL 2, SHAY) | 10,090 |
| SPIRO | 12,307 |
| WAPANUCKA | 12,450 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.907469, -95.200474
Every well in Latimer County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.