TOWRY #8
API 3507721762 · Latimer County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
DIRECTIONAL HOLEACGASIntervals
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| RED OAK-RED OAK | PLUG AND ABANDON | 6,750 | 6,771–6,870 | Acid, Frac |
| ATOKA BASAL (SPIRO) | GAS | — | 11,572–11,634 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2022-03-07 | 0 | 0 | 0 | — | 0 | 0 |
| 2022-03-07 | 0 | 25 | 0 | — | 20 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4.5 | 13.5 | P-110 | 11,892 | 1,315 |
| INTERMEDIATE | 9 5/8 | 40 | J-55 | 3,133 | 685 |
| SURFACE | 13 3/8 | 48 | H-40 | 104 | 10 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 17 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-08-28
WRADRDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA UP | 3,400 |
| FANSHAWE (ATOKA) | 5,970 |
| RED OAK | 6,750 |
| PANOLA | 7,110 |
| BRAZIL | 7,860 |
| ATOKA BAS (SPIRO) | 8,550 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2008-08-28
WRAAMDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA UP | 3,400 |
| FANSHAWE (ATOKA) | 5,970 |
| RED OAK | 6,750 |
| PANOLA | 7,110 |
| BRAZIL | 7,860 |
| ATOKA BAS (SPIRO) | 8,550 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2022-01-24
WRARCDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA UP | 3,400 |
| FANSHAWE (ATOKA) | 5,970 |
| RED OAK | 6,750 |
| BRAZIL | 7,860 |
| ATOKA BAS (SPIRO) | 11,509 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.008227, -94.960066
Every well in Latimer County, Oklahoma