JONES UNIT #11
API 3507721805 · Latimer County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 3
DIRECTIONAL HOLEACGASIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| UPPER ATOKA | GAS | 2,762–3,206 | Frac |
| FANSHAWE (ATOKA) | GAS | 6,742–6,827 | Frac |
| PANOLA(ATOKA) | GAS | 8,033–8,234 | Frac |
| BASAL ATOKA (SPIRO) | GAS | 12,344–12,412 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-06-13 | 0 | 2,247 | 0 | — | 0 | 0 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| SURFACE | 9 5/8 | 40 | J-55 | 2,490 | 1,037 |
| PRODUCTION | 4 1/2 | 13.50/15.10 | P-110 | 12,599 | 1,511 |
| CONDUCTOR | 14 | 94 | H-40 | 33 | 4 |
Drilling permits
Oklahoma files 4 applications to drill this well, naming 19 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2009-12-01
WRADRDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| FANSHAWE (ATOKA) | 6,760 |
| RED OAK | 7,500 |
| PANOLA (ATOKA) | 8,030 |
| BRAZIL | 8,300 |
| ATOKA BAS (SPIRO) | 12,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2009-12-01
WRAAMDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| FANSHAWE (ATOKA) | 6,760 |
| RED OAK | 7,500 |
| PANOLA (ATOKA) | 8,030 |
| BRAZIL | 8,300 |
| ATOKA BAS (SPIRO) | 12,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2009-12-01
WRAAMDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| FANSHAWE (ATOKA) | 6,760 |
| RED OAK | 7,500 |
| PANOLA (ATOKA) | 8,030 |
| BRAZIL | 8,300 |
| ATOKA BAS (SPIRO) | 12,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2010-04-29
WRARCDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA UP | 2,759 |
| FANSHAWE (ATOKA) | 6,735 |
| PANOLA (ATOKA) | 8,037 |
| ATOKA BAS (SPIRO) | 12,344 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.003792, -95.084843
Every well in Latimer County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.