HOLLY #1-7
API 3507721824 · Latimer County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
DIRECTIONAL HOLENDGASInterval
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| ATOKA LOWER (CECIL) | GAS | 10,992 | 10,992–11,103 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2023-08-24 | 0 | 1,082 | 1 | — | 5,841 | 12 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5-1/2 | 20 | P-110 | 11,443 | 1,300 |
| CONDUCTOR | 20 | — | — | 60 | 0 |
| INTERMEDIATE | 9-5/8 | 36 | J-55 | 1,993 | 560 |
| SURFACE | 13-3/8 | 54.5 | J-55 | 250 | 220 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2022-08-05
WRADRDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA UP | 2,300 |
| ATOKA MID | 6,022 |
| ATOKA LOW | 7,522 |
| ATOKA BAS (SPIRO) | 12,775 |
| UNION VALLEY | 12,980 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2022-08-05
WRAAMDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA UP | 2,300 |
| ATOKA MID | 6,022 |
| ATOKA LOW | 7,522 |
| ATOKA BAS (SPIRO) | 12,775 |
| UNION VALLEY | 12,980 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.915141, -95.129328
Every well in Latimer County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.