WILBO #7-1

API 3508124098 · Lincoln County, Oklahoma

ACOIL
API
3508124098
Operator
HULEN OPERATING COMPANY
County
Lincoln

Completions

Oklahoma files 2 completion reports for this well. 2 carry a production test the operator filed.

Completion 1

STRAIGHT HOLEACOIL
Spudded
2012-04-05
Drilling finished
2012-04-16
Completed
2012-04-19
Recompleted
2014-10-20
First production
2012-12-12
Total depth
5,769 ft
Operator
HULEN OPERATING COMPANY

Interval

FormationProducedPerforated (ft)Treatment
WOODFORDOIL5,534–5,596Acid, Frac

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2014-11-20215120400—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5.515.5J-555,730250
SURFACE8.62524J-55547300

Completion 0

STRAIGHT HOLEACOIL
Spudded
2012-04-05
Drilling finished
2012-04-18
Completed
2013-04-19
First production
2012-12-12
Total depth
5,769 ft
Operator
HULEN OPERATING COMPANY

Interval

FormationProducedPerforated (ft)Treatment
MISENEROIL5,634–5,638Acid, Frac

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2013-03-31311115539.21,400—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5.515.5J-555,730250
SURFACE8.62524J-55547300

Drilling permits

Oklahoma files 2 applications to drill this well, naming 11 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2012-03-14

WRADRStraight hole
Permit API
35081240980000
Operator
HULEN OPERATING COMPANY
Well type
OIL
Approved
2012-03-14
Expires
2012-09-14
Proposed depth
5,700 ft
Surface casing
520 ft
Ground elevation
1,156 ft

Target formations

FormationExpected top (ft)
CLEVELAND UP4,460
CLEVELAND LOW4,500
OSWEGO5,030
PRUE5,060
SKINNER5,150
RED FORK5,240
BARTLESVILLE5,390
WOODFORD5,600
MISENER5,644
HUNTON5,650

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Filed 2014-04-14

WRARCStraight hole
Permit API
35081240980001
Operator
HULEN OPERATING COMPANY
Well type
OIL
Approved
2014-04-14
Expires
2014-10-14
Proposed depth
5,769 ft
Surface casing
547 ft
Ground elevation
1,156 ft

Target formation

FormationExpected top (ft)
WOODFORD5,600

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

35.530958, -97.135503

35.53096, -97.13550 · Surface location as filed with Oklahoma

Every well in Lincoln County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.