RHODES #2-22
API 3508323344 · Logan County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 1,712 | 480 |
| Nov 2025 | 1,776 | 470 |
| Oct 2025 | 1,698 | 440 |
| Sep 2025 | 1,394 | 480 |
| Aug 2025 | 1,711 | 440 |
| Jul 2025 | 920 | 470 |
| Jun 2025 | 1,771 | 440 |
| May 2025 | 1,721 | 470 |
| Apr 2025 | 1,333 | 450 |
| Mar 2025 | 1,562 | 480 |
| Feb 2025 | 1,459 | 470 |
| Jan 2025 | 1,737 | 440 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| LAYTON LOW | INJ | 4,756–4,787 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,985 | 230 |
| SURFACE | 8 5/8 | 24 | J-55 | 460 | 315 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 5 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1996-06-12
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| HOOVER | 3,190 |
| CARMICHAEL | 3,320 |
| PERRY | 4,400 |
| LAYTON | 4,670 |
| HOGSHOOTER | 4,800 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.930291, -97.498595
Every well in Logan County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.