MILLER #1-23 SWD
API 3508323357 · Logan County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 5 | 340 |
| Nov 2025 | 4 | 340 |
| Oct 2025 | 5 | 340 |
| Sep 2025 | 16 | 350 |
| Aug 2025 | 5 | 340 |
| Jul 2025 | 2 | 340 |
| Jun 2025 | 2 | 340 |
| May 2025 | 2 | 310 |
| Apr 2025 | 2 | 340 |
| Mar 2025 | 4 | 340 |
| Feb 2025 | 1 | 340 |
| Jan 2025 | 2 | 340 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 3
STRAIGHT HOLEAC2DNCInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| ENDICOTT | DISP | 3,500–3,630 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,950 | 200 |
| SURFACE | 8 5/8 | 24 | J-55 | 443 | 300 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1996-09-27
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| HOOVER | 3,000 |
| CARMICHAEL | 3,250 |
| ENDICOTT | 3,900 |
| AVANT | 4,200 |
| PERRY | 4,350 |
| LAYTON UP | 4,600 |
| COTTAGE GROVE | 4,800 |
| LAYTON LOW | 4,850 |
| LAYTON LOW | 4,900 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2012-11-09
WRARCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ENDICOTT | 3,550 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.929393, -97.494814
Every well in Logan County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.