JANE #2-16
API 3508323547 · Logan County, Oklahoma
OROIL
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEOROILSpudded
2001-05-04
Drilling finished
2001-05-12
Completed
2001-06-03
Recompleted
2016-12-20
First production
2002-03-01
Total depth
5,360 ft
Operator
REDLAND DEVELOPMENT LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| LAYTON | TA | 5,207–5,222 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 10.5 | J-55 | 5,354 | 150 |
| SURFACE | 8 5/8 | 24 | J-55 | 322 | 350 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 8 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2001-04-17
WRADRPermit API
35083235470000
Operator
REDLAND DEVELOPMENT LLC
Well type
OIL
Approved
2001-04-17
Expires
2001-10-17
Proposed depth
6,400 ft
Surface casing
350 ft
Ground elevation
1,018 ft
Target formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 4,000 |
| PERRY | 4,900 |
| LAYTON | 5,200 |
| HOGSHOOTER | 5,400 |
| CLEVELAND | 5,600 |
| OSWEGO | 6,000 |
| PRUE | 6,100 |
| SKINNER | 6,250 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.859640, -97.633474
35.85964, -97.63347 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Logan County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.