COOLEY #1A
API 3508323984 · Logan County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
STRAIGHT HOLEACGASInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HOGSHOOTER | GAS | 5,501–5,523 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-08-20 | 1 | 38 | 30 | 40 | 1,590 | 1 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | J-55 | 5,839 | 195 |
| SURFACE | 8 5/8 | 24 | J-55 | 422 | 280 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 28 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-12-29
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| LAYTON | 5,330 |
| HOGSHOOTER | 5,460 |
| CHECKERBOARD | 5,650 |
| BIG LIME | 6,006 |
| OSWEGO | 6,120 |
| PRUE | 6,200 |
| RED FORK | 6,330 |
| HUNTON | 6,661 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2011-12-29
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 4,260 |
| PERRY | 4,850 |
| LAYTON | 5,330 |
| HOGSHOOTER | 5,460 |
| BIG LIME | 6,006 |
| OSWEGO | 6,120 |
| PRUE | 6,200 |
| RED FORK | 6,330 |
| WOODFORD | 6,582 |
| HUNTON | 6,661 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2011-12-29
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 4,260 |
| PERRY | 4,850 |
| LAYTON | 5,330 |
| HOGSHOOTER | 5,460 |
| BIG LIME | 6,006 |
| OSWEGO | 6,120 |
| PRUE | 6,200 |
| RED FORK | 6,330 |
| WOODFORD | 6,582 |
| HUNTON | 6,661 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.785055, -97.627924
Every well in Logan County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.