BOMAR UNIT (MARGUERITE 18-1) #18-2
API 3508520998 · Love County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 5,385 | 2,250 |
| Nov 2025 | 6,784 | 2,113 |
| Oct 2025 | 6,720 | 1,808 |
| Sep 2025 | 8,495 | 1,890 |
| Aug 2025 | 9,254 | 1,906 |
| Jul 2025 | 8,521 | 1,991 |
| Jun 2025 | 9,226 | 2,065 |
| May 2025 | 7,260 | 2,175 |
| Apr 2025 | 9,320 | 2,200 |
| Mar 2025 | 5,030 | 2,252 |
| Feb 2025 | 3,755 | 2,250 |
| Jan 2025 | 8,165 | 2,231 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| LIDDELL | INJ | 8,190 | 8,190–8,256 | Acid, Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 & 17 | J-55 | 1,040 | 402 |
| PRODUCTION | 5 1/2 | 15.5 & 17 | J-55 | 8,364 | 350 |
| SURFACE | 9 5/8 | 36 | J-55 | 722 | 205 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 5 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1998-05-29
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| SNUGGS | 7,000 |
| DILLARD | 7,440 |
| WELCH | 8,200 |
| FOSTER | 8,325 |
| LIDDELL | 8,350 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
33.854173, -97.130500
Every well in Love County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.