HDSU-VAN BUSKIRK #4-1

API 3508521085 · Love County, Oklahoma

AC2RIn
API
3508521085
Operator
E2 OPERATING LLC
County
Love

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2RIn
Injection zone
DEESE|DEESE MARKER|DEESE SAND|DORNICK HILLS|STACY SAND
Cumulative fluid injected
39,173 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 20253,6211,500
Nov 20253,4931,500
Oct 20253,8051,500
Sep 20253,7911,433
Aug 20254,1021,211
Jul 20255,0201,500
Jun 20255,6511,347
May 20253,137855
Apr 20252,332600
Mar 20252,623600
Feb 2025704600
Jan 2025894533

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 0

STRAIGHT HOLEAC2RIn
Spudded
2010-08-14
Drilling finished
2010-09-05
Completed
2010-10-12
First production
2010-10-15
Total depth
7,880 ft
Operator
E2 OPERATING LLC

Interval

FormationProducedPerforated (ft)Treatment
DEESEINJ7,722–7,760Acid, Frac

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/217J-557,855750
CONDUCTOR20——403
SURFACE8 5/824J-551,350725

Drilling permit

Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2010-06-15

WRADRStraight hole
Permit API
35085210850000
Operator
MID-CON ENERGY OPERATING INC
Well type
2RIn
Approved
2010-06-15
Expires
2010-12-15
Proposed depth
7,855 ft
Surface casing
1,310 ft
Ground elevation
940 ft

Target formation

FormationExpected top (ft)
DEESE7,755

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

34.066032, -97.366475

34.06603, -97.36647 · Surface location as filed with Oklahoma

Every well in Love County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.