E. CRINER BROMIDE SAND UNIT (BING UT.1) #15-1
API 3508700069 · McClain County, Oklahoma
AC2RIn
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2RIn
Injection zone
BROMIDE
Cumulative fluid injected
751,342 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 63,173 | 550 |
| Nov 2025 | 71,045 | 550 |
| Oct 2025 | 70,772 | 500 |
| Sep 2025 | 78,899 | 60 |
| Aug 2025 | 53,218 | 600 |
| Jul 2025 | 44,468 | 550 |
| Jun 2025 | 69,217 | 600 |
| May 2025 | 69,442 | 600 |
| Apr 2025 | 68,074 | 800 |
| Mar 2025 | 74,665 | 580 |
| Feb 2025 | 33,237 | 900 |
| Jan 2025 | 55,132 | 950 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 3
STRAIGHT HOLEAC2RInSpudded
1959-02-09
Drilling finished
1959-04-27
Completed
1959-05-13
Recompleted
2011-01-04
First production
1959-05-13
Total depth
10,155 ft
Operator
FBF ENERGY LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| BROMIDE | TA | 9,960–9,970 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | — | — | 10,170 | 200 |
| SURFACE | 10 3/4 | — | — | 766 | 475 |
Completion 4
STRAIGHT HOLEAC2RInSpudded
1959-02-09
Drilling finished
1959-04-29
Completed
1959-05-13
Recompleted
2012-06-11
Total depth
10,164 ft
Operator
FBF ENERGY LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| BROMIDE | INJ | 9,950–9,970 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | — | — | 10,155 | 1,200 |
| LINER | 4 1/2 | — | — | 9,930 | 500 |
| SURFACE | 10 3/4 | — | — | 766 | 475 |
Location
34.962684, -97.522824
34.96268, -97.52282 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in McClain County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.