HARMON #1H-31XR
API 3508722032 · McClain County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| WOODFORD | OIL | 11,438–21,243 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2015-11-11 | 662 | 592 | 1,315 | 44.9 | 1,080 | 34 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 23 | P-110 | 21,388 | 3,245 |
| SURFACE | 9 5/8 | 40 | J-55 | 1,500 | 405 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2015-07-20
WRADRHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPIAN | 11,028 |
| WOODFORD | 11,214 |
| HUNTON | 11,361 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.015940, -97.669470
Every well in McClain County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.