SHARP 5N 1W 3 #1HX
API 3508722071 · McClain County, Oklahoma
Completions
Oklahoma files 2 completion reports for this well. One carries a production test the operator filed.
Completion 1
HORIZONTAL HOLEACOILCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 9 5/8 | HCP-110 | 40 | 5,892 | 490 |
| PRODUCTION | 5 1/2 | P-110 | 20 | 15,212 | 3,180 |
| SURFACE | 13 3/8 | J-55 | 54.5 | 516 | 545 |
Completion 2
HORIZONTAL HOLEACOILInterval
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| WOODFORD | OIL | 6,436 | 6,702–15,041 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2021-04-22 | 83 | 95 | 1,830 | — | 1,000 | 21/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 9 5/8 | 40# | HCP-110 | 5,892 | 490 |
| PRODUCTION | 5 1/2 | 20 | P-110 | 15,212 | 3,180 |
| CONDUCTOR | 20 | — | — | 110 | 0 |
| SURFACE | 13 3/8 | 54.5 | J-55 | 516 | 545 |
Drilling permits
Oklahoma files 5 applications to drill this well, naming 11 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2017-04-06
WRADRHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| PENNSYLVANIA UNCONF BAS SD | 6,386 |
| WOODFORD | 6,436 |
| HUNTON | 6,580 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2017-04-06
EXTRCHorizontal holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| WOODFORD | 6,436 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2017-04-06
EXTAMHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| PENNSYLVANIA UNCONF BAS SD | 6,386 |
| WOODFORD | 6,436 |
| HUNTON | 6,580 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2017-04-06
WRAAMHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| PENNSYLVANIA UNCONF BAS SD | 6,386 |
| WOODFORD | 6,436 |
| HUNTON | 6,580 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2021-03-23
WRARCMUTarget formation
| Formation | Expected top (ft) |
|---|---|
| WOODFORD | 6,436 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.929571, -97.294427
Every well in McClain County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.