WEST GOLDSBY OSBORN UNIT #T-6-1 WIW

API 3508722351 · McClain County, Oklahoma

AC2RIn
API
3508722351
Operator
TWISTED OAK OPERATING LLC
County
McClain

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2RIn
Injection zone
OSBORN
Cumulative fluid injected
193,546 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 202515,1001,284
Nov 202515,3611,269
Oct 202515,4181,263
Sep 202515,7301,296
Aug 202516,1141,260
Jul 202515,8511,250
Jun 202515,3541,228
May 202516,8161,239
Apr 202516,4321,225
Mar 202516,8391,222
Feb 202516,3091,211
Jan 202518,2221,207

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 0

DIRECTIONAL HOLEAC2RIn
Spudded
2022-07-25
Drilling finished
2022-08-06
Completed
2022-08-26
Total depth
9,347 ft
Measured depth
9,347 ft
True vertical depth
9,313 ft
Operator
TWISTED OAK OPERATING LLC

Interval

FormationProducedPerforated (ft)Treatment
OSBORNINJ9,282–9,302Frac

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/217HCP-1109,343720
SURFACE9 5/836K-55888335

Drilling permit

Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2022-04-15

WRADRDirectional hole
Permit API
35087223510000
Operator
TWISTED OAK OPERATING LLC
Well type
2RIn
Approved
2022-04-19
Expires
2023-10-19
Proposed depth
9,450 ft
Surface casing
900 ft
Ground elevation
1,242 ft

Target formation

FormationExpected top (ft)
OSBORN9,100

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

35.127122, -97.501541

35.12712, -97.50154 · Surface location as filed with Oklahoma

Every well in McClain County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.