NE DAVIS UNIT (JAMESON 2) #1-2
API 3509900624 · Murray County, Oklahoma
PATM
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
TM
Injection zone
OIL CREEK UP
Cumulative fluid injected
0 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 3
STRAIGHT HOLEPATMSpudded
1986-08-08
Drilling finished
1986-08-11
Completed
1986-08-11
Operator
HIGHMARK ENERGY OPERATING LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| OIL CREEK UP | DRY | 1,970–2,158 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 14 | J-55 | 2,091 | 150 |
| SURFACE | 8 5/8 | — | — | 69 | 50 |
Location
34.557638, -97.068820
34.55764, -97.06882 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Murray County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.