TAPPE #1-28

API 3510324437 · Noble County, Oklahoma

PAOG
API
3510324437
Operator
DAKOTA EXPLORATION LLC
County
Noble

Completion

Oklahoma files 1 completion report for this well.

Completion 1

PAOG
Spudded
2012-10-29
Drilling finished
2012-11-04
Completed
2012-11-08
Total depth
5,160 ft
Operator
DAKOTA EXPLORATION LLC

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
—————0

Drilling permits

Oklahoma files 2 applications to drill this well, naming 19 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2012-10-24

WRADRStraight hole
Permit API
35103244370000
Operator
DAKOTA EXPLORATION LLC
Well type
OG
Approved
2012-10-24
Expires
2013-04-24
Proposed depth
5,200 ft
Surface casing
480 ft
Ground elevation
1,119 ft

Target formations

FormationExpected top (ft)
RAGAN1,735
AVANT3,290
OSAGE LAYTON /MISSOURIAN/3,740
OSWEGO4,380
SKINNER4,680
MISSISSIPPI4,790
MISENER4,945
VIOLA4,970
SIMPSON GP5,000

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Filed 2012-10-24

WRAAMStraight hole
Permit API
35103244370001
Operator
DAKOTA EXPLORATION LLC
Well type
DRY
Approved
2012-10-24
Expires
2013-04-24
Proposed depth
5,160 ft
Surface casing
480 ft
Ground elevation
1,119 ft

Target formations

FormationExpected top (ft)
COUNCIL GROVE1,170
RAGAN1,735
AVANT3,290
OSAGE LAYTON /MISSOURIAN/3,740
OSWEGO4,380
SKINNER4,680
MISSISSIPPI4,790
MISENER4,945
VIOLA4,970
SIMPSON GP5,000

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

36.265791, -97.315915

36.26579, -97.31592 · Surface location as filed with Oklahoma

Every well in Noble County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.